High CourtsDivision Bench

M/S Tamil Nadu Waste Management Ltd vs Delhi State Industrial And Infrastructure Development Corporation Ltd (DSIIDC)

Delhi High Court · Decided on 19 November 2018 · Citation: (2018) 11 DEL CK 0128

HON’BLE JUDGES
S. Ravindra Bhat, J · Prateek Jalan, J
ACTS & SECTIONS REFERRED
Constitution of India, 1950 — Article 226
RESULT
Dismissed
CASE NUMBER
Civil Writ Petition No.11544 Of 2018 & Civil Miscellaneous Appl. Nos. 44676-44677 Of 2018
Ask AI about this case

AI Structured Summary

Not yet generated for this judgment

No AI summary yet

Generate an eight-section analysis of this judgment — facts, issues, reasoning, ratio and a plain-language gist.

Judgment

79 paragraphs · 1,430 words
1.

This writ petition concerns a Notice Inviting Tenders (NIT No. 2/17-18) issued by the Respondent for “Development of Treatment, Storage and

Disposal Facility for Hazardous Waste on Build, Own, Transfer basis at Bawana, Delhi†(hereafter, “the NITâ€). The Petitioner is aggrieved by

the rejection of its bid on the ground that it has not complied with the technical specifications of the tender.

2.

The undisputed facts are these: The NIT was issued in February 2018. The petitioner and one other party responded, and technical bids were

opened on March 7, 2018. Certain clarifications were sought by the Respondent by a letter dated April 13, 2018, to which the Petitioner responded on

April 17, 2018. By a letter dated June 27, 2018, the Respondent informed the Petitioner than an Evaluation Committee had been constituted and invited

the Petitioner to make a power point presentation of its technical proposal before the Evaluation Committee on July 2, 2018. The presentation was

thereafter rescheduled by a letter dated August 3, 2018, and in fact took place on August 7, 2018. The other bidder, viz. SMS Ltd., also made a

presentation to the Technical Evaluation Committee. The Petitioner states that it was verbally informed on September 27, 2018 regarding the rejection

of its technical bid, against which it made representations to the Respondent. However, a Tender Summary Report was uploaded on the website

(where the e-tender was hosted) on October 18, 2018 stating that the Petitioner had not complied with the technical specifications of the tender. It is

in these circumstances that the present Writ Petition has been filed.

3.

Mr. Raj Shekhar Rao, learned counsel for the Petitioner submitted that rejection of the Petitioner’s bid has led to a single bidder being treated

as responsive, and the Petitioner has not even been informed of the reasons. He contented that the bid documents permitted the Respondent to

evaluate the technical bid only on the grounds contained therein and the Respondent was neither entitled to call for presentations from the bidders

after opening the technical bids, nor was it permitted to reject the bids on grounds other than those mentioned in the tender conditions.

4.

Ms. Anusuya Salwan, learned counsel for the Respondent, on the other hand, submitted that the bid of the Petitioner had been found unsuitable on

evaluation by the duly constituted committee, as contemplated by the NIT. She referred in particular to Clauses 3.1, 3.3.6, 3.3.7 and Appendix X of

the NIT. Ms. Salwan submitted that the technical evaluation of an expert committee ought not to be interfered with by the Court under Article 226 of

the Constitution. She also placed the original record of the Respondent before us.

5.

The relevant Clauses of the NIT are set out below:-

“3.1 Opening of the Bids

3.1.1 An Evaluation Committee, constituted by DSIIDC will open Technical Bids as per scheduled date and time in the presence of the Bidders who

choose to attend.

3.1.2 The Evaluation Committee will subsequently examine and evaluate the Bids in accordance with the provisions set out in this Section 3.

3.1.3 To facilitate evaluation of Bids, DSIIDC may, at its sole discretion, seek clarification in writing from any Bidder regarding its Bid and such

Bidder shall provide its response in writing within the time period specified by DSIIDC in this regard.

3.1.4 In the event DSIIDC receives only one Bid, it may at its sole discretion open and evaluate such Bid, reject it, cancel the Bidding Process or

launch a new bidding process.

.....

“3.3.6 The Technical Bids shall contain all the elements described in Appendix XI. If a Bidder does not provide all the elements requested under

Appendix XI in its Technical Bid, then its Technical Bid shall be declared not eligible by DSIIDC and shall be rejected. A Bidder whose Technical Bid

has been declared not eligible by DSIIDC shall be disqualified from the Bidding Process and its Bid Security shall be returned as per Clause 2.16.3

3.3.7 The Evaluation Committee shall review complaint Technical Bids and apply the evaluation criteria set out in Appendix XI to determine whether

the Technical Bids pass or fail the conditions of such Appendix XI.â€​

6.

Ms. Salwan submitted that reference to “Appendix XI†in Clauses 3.3.6 and 3.3.7 should be read as “Appendix Xâ€, which provides the

format of the technical bid. Appendix X provides inter alia that the bidder must provide the technical approach and methodology it proposes to employ.

The following parameters of evaluation, alongwith the weightage attributed to each and the respective criteria for evaluation, are set out therein:-

1.

Technical Plan for Construction of the TSDF including secured landfill and incinerator for hazardous waste (35marks)

2.

Operation & Maintenance Plan (35marks)

3.

Organization & Staffing (15marks)

4.

Environment Health & Safety Policy and Practice (15marks).

It is also provided in Appendix X as follows:-

“A Bidder shall have to score at least 70% against each and every parameter in order to qualify for the opening of the Financial Proposal.â€​

7.

It is evident that the NIT specifically provided for a Technical Evaluation Committee and also for clarifications to be sought by the Respondent to

facilitate the evaluation of the bids. By its letters dated June 27, 2018 and August 03, 2018, the Respondent invited the Petitioner to make a power

point presentation of the technical proposal submitted by it before the Evaluation Committee. We are of the view that such a course was very much

open to the Respondent. In a complex contract such as the present one, the Respondent could reasonably decide that a power point presentation

which explains the bidder's technical proposal, would be the most effective way of seeking the required clarifications and reaching an informed

decision. In any event, the Petitioner participated in this process without demur, and we are not inclined to accept its belated protest on this score.

8.

Similarly, we are also unable to accept the Petitioner's argument that the technical evaluation of the bid ought to have been concluded only on the

bid documents submitted, and without reference to the presentations made by the bidders. It is clear from the letters dated June 27, 2018 and August

03, 2018 referred to above, that the presentations were required to be in line with the technical proposal already submitted by the bidder, and that the

purpose of the presentation was to enable evaluation of the technical bids. Having called for such presentations, it would in fact have been perverse

for the Respondent to have ignored them altogether.

9.

We have also examined the original records of the Respondent placed by Ms. Salwan and find a detailed appraisal of the technical proposals of

both the bidders by the Technical Evaluation Committee on August 07, 2018, i.e. the date on which the presentations were made. The committee has

pointed out several deficiencies in the Petitioner's proposals including inter alia the following:-

“Remarks

• Layout Orientation of the plant found incorrect.

• Landfill has been designed over the existing natural escape drain.

• Existing natural escape drain has been diverted without considering land requirements and statutory clearances to be obtained which may affect

the implementation plan.

• Detailed area allocation statement not provided.

• The implementation plan does not include the timeline for obtaining Statutory approval from concerned authorities in relation to construction below

High Tension lines.

• Calculation and methodology for the operation not shown.

• Nothing mentioned about Material Balance sheet for the plant.

• Qualification of manpower at every section not provided.

• Details about leachate likely to be generated and its treatment not provided.

• No information about sewage generation and treatment provided.

• Surface runoff treatment plan not given.â€​

10.

Consequently, the committee has awarded only 48 marks out of 100 to the Petitioner's technical proposal whereas the other bidder (M/s SMS

Ltd.) has been awarded 79 marks out of 100. The Petitioner failed to score the minimum qualifying score of 70% against each of the stipulated

criteria. The deficiencies identified by the Technical Committee upon which the Respondent has based its decision do not appear to be arbitrary or

perverse in a sense that would justify the intervention of the Court. To sit in review over the merits of a technical evaluation is entirely beyond the

realm of the Court's jurisdiction in such cases, and Mr. Rao very rightly did not invite us to do so.

11.

For the reasons aforesaid, we see no reason to interfere with the impugned decision of the Respondent. The writ petition is dismissed, but without

any order as to costs.