Mr. B.S. Walia, J. - New India Assurance Company (hereinafter referred to as the company) (although the same ought to have been New India
Assurance Company Limited) is in appeal against order Annexure-A dated 23.12.2013 passed in consumer complaint No. 33/2011 in case titled
as Mohammad Akram Bhat v. Divisional Manager and others whereby complaint filed by the respondent was allowed and a sum of Rs.
2.85 Lacs along with Rs. 7000/- as litigation charges, total Rs. 2.92 Lacs was awarded, to be paid by the appellant to the respondent or to be
deposited in the State Commission within 6 weeks from the date of order. Although the appeal is liable to be dismissed on the ground of not having
been instituted by the correct party, however, ignoring technicality, we proceed to examine the case on merit.
Learned counsel contended that the award was passed behind the back of the appellant company and that although the presence of counsel was
marked in the order but a perusal of the order revealed that none was present on behalf of the appellant company when the matter was heard by
the State Commission. Secondly, the State Commission had misconstrued the survey report as there was absolutely no material available with the
State Commission on the basis of which the report submitted by the surveyor could be discarded. The State Commission also failed to take into
account the consent letter which formed part of the record. Thirdly, the nature of damage as evident from the photographs appended with the
appeal revealed that there was no question of award of compensation by treating the building liable to reconstruction. Lastly, the award by the
State Commission based on the assumption that the building in question had to be reconstructed was not supported by any material available on
record.
Respondent had insured his 2 storeyed residential house building (A Class Construction) under the ""FIRE AND SPECIAL PERILS POLICY
under Insurance Policy No. 1135120393407 for a sum of Rs. 10 lakhs for a period of one year i.e. from 24th of August 2010 to 23rd of August
2011 and was issued insurance policy, Annexure-A attached with the complaint. On account of damage to the insured building in an earthquake,
the respondent submitted a claim to the appellant along with all relevant record including certificate Annexure-C attached with the complaint as
issued by the Assistant Executive Engineer, Srinagar Municipal Corporation to the effect that the residential house of the respondent was unfit for
residential purposes and required complete reconstruction while copy of loss to the building estimated at Rs. 14.97 lakhs was attached along with
the complaint as Annexure-B.
Eventually the appellants informed the respondent that the surveyor had submitted the assessment report estimating the loss at Rs 27,266/- only.
The same was protested to by the respondent on account of the loss assessed being far less than the actual loss suffered by the respondent i.e. Rs.
14.97 lakhs as per estimate of reconstruction prepared by a competent and qualified engineer as per the PWD Schedule of 2008 approved by the
State Government.
It needs noticing here that the alleged consent letter attached to the surveyors report at page No. 34 of the appeal was not submitted before the
State Consumer Disputes Redressal Commission. Besides in the appeal there is no application for additional evidence on record. For the
aforementioned reasons the reliance on the consent letter cannot be gone into. Moreover, the alleged consent letter was for final settlement at a
particular amount and when the matter was not settled at the said amount and the respondent approached the State Consumer Disputes Redressal
Commission with his grievance for full indemnity after returning cheque Annexure-G dated 31.05.2011 for an amount of Rs. 27,266/- to the
appellant on account of the same being on much lower side than the loss suffered, the said consent letter loses its significance. As has been noticed
above, the complaint filed by the respondent was allowed and a sum of Rs. 2.85 Lacs along with Rs. 7000/- as litigation charges, total Rs. 2.92
Lacs was awarded to be paid by the appellant to the respondent or to be deposited in the State Commission within 6 weeks from the date of
order.
We have heard Learned Counsel for the appellant and have perused the record. However, we are of the considered view that the order passed
by the State Consumer Disputes Redressal Commission, Srinagar i.e. Annexure-A dated 23rd of December 2013 does not suffer from any
infirmity so as to warrant interference, therefore the appeal merits dismissal for the reasons recorded hereunder.
Admittedly, respondent insured his 2 storeyed residential house building (A Class Construction) along with electric fittings, furniture and fixtures
under the ""FIRE AND SPECIAL PERILS POLICY"". On account of the respondent's insured building suffering damage in an earthquake in 2010,
claim was made before the appellant for indemnification of the loss which was not done to the satisfaction of the respondent which led to his filing a
complaint before the State Commission seeking indemnity to the tune of Rs. 10 lakhs.
In the written statement filed by the appellant before the State Commission it was pleaded that the damaged house required repairs only and not
reconstruction and that in view thereof the claim by the respondent was excessive.
The State Commission came to a categorical finding that a perusal of the survey report revealed that the same had been prepared with a pre-
determined mind with repairs in focus. The State Commission further came to the conclusion that excluding the cost of reasonable construction
material, the quantum of indemnity had to be worked out on the basis of construction cost of a 2 storeyed building as it might have been before the
incident which roughly worked out to Rs. 2.6 lakhs which obviously would have been payable to the respondent way back in August 2011 entitling
him to compensation for loss of profit/earning thereupon for 2 intervening years which even if assessed at a meagre 5% per annum would entitle
him to another Rs. 25,000/-. On the aforementioned basis, the State Commission allowed the complaint and awarded a sum of Rs. 2.85 Lacs
along with litigation charges of Rs. 7000/- total Rs. 2.92 lakhs to be paid to the respondent or to be deposited by the appellant in the State
Commission within 6 weeks from the date of the order. The State Commission also arrived at the categorical finding that the affidavits filed by the
respective witnesses of the parties did not inspire sufficient confidence in order to enable the same to be relied upon and that the survey report was
the only material indicative of the probable damage of the house.
The respondents witness i.e. Maroof Ahmad Banday, Assistant Executive Engineer, Srinagar Municipal Corporation deposed on affidavit that
he had visited the site and after inspection had come to the conclusion that the residential house of the respondent was unfit for residential purposes
and needed complete reconstruction, therefore he issued communication bearing No. SMC/AEE/312, dated 04.03.2011 addressed to the Branch
Manager of the appellant regarding the damage and position of the residential house of the respondent and further that the contents of the
aforementioned communication were true and correct, bore his signature and were based on his personal inspection and spot verification. In cross-
examination, the said witness stated that he was a civil engineer in government service since the past 25 years and was dealing with construction
and further that at the moment he was dealing with construction of the Townhall at Nowshera, Srinagar which was at the completion stage.
Cross examination of the aforesaid witness, apart from eliciting that there was no rule as such authorising the witness to issue a certificate and
the right to issue such certificate being based on practise, is of no significance and no further questions were asked from the said witness especially
with regard to the veracity of the certificate or for that matter with regard to the damage and position of the residential house nor was any
suggestion put to the witness that the certificate was incorrect or false. In view of the aforementioned position, the cross examination of the said
witness is of no help to the appellant.
Another witness of the respondent i.e. Abdul Hamid Shoda, qualified engineer associated with Bhat Associates (Engineers, Valuers and
Estimators) stated that he visited the damaged house of the respondent and after thorough survey came to the conclusion that the damaged house
needed reconstruction and after taking into account all relevant schedules prepared the estimate for reconstruction of the house to the tune of Rs.
14.97 Lakhs. Said witness further stated that the estimate prepared by him for reconstruction of the residential house of the respondent had been
prepared on the basis of spot verification through analysis and as per the ""PWD SCHEDULE OF 2008, APPROVED BY THE STATE
GOVERNMENT"" and that the same bore his seal and signatures and that the contents thereof were true and correct and that the estimate/cost of
reconstruction was annexed with the affidavit.
In cross-examination, the aforesaid witness stated that he was a diploma holder in civil engineering and got degree in 1982 and was in
government service as junior engineer and was presently posted in the irrigation and flood control department and that the said department was
doing estimation of buildings, bridges, culverts, etc. The witness also gave the rates of construction, the type of material used, the covered area, the
basis on which the estimation was done i.e. PWD rates, material which could be reused, extent of damage in support of the estimation given by
him.
On the other hand, Hilal Ahmad Raja (Surveyor and Loss Assessor) of the appellant company gave affidavit that the final survey report had
been issued by him based on the assessment of loss and on the strength of the document's submitted by the respondent. In his cross-examination
he stated that the estimate of loss was based on reconstruction basis whereas he had prepared and assessed the loss on repair basis. He further
admitted that it was true that once wide cracks had developed in the building, the same would need reconstruction He further stated that as per
practise he had allowed the lowest market rate but not as per the schedule of PWD. A very important aspect of the matter which has a bearing on
the assessment qua claim made is that as per statement of the Surveyor, he was an electrical engineer. At this stage it would be fruitful to refer to
the extract of the surveyor's report.
EXTRACT OF SURVEYOR'S REPORT:
POSITION AT S URVEY:
In pursuance to the instructions received from the insurers concerned to conduct the final survey of the above captioned loss. The undersigned on
09-10-2010 visited the risk premises situated at Tailbal Srinagar Kashmir to carry out the detailed survey of the subject loss. Mr. Mohammad
Akram Bhat was present at the time of our visit and he along with his representative assisted us in conducting the survey. During the course of our
visit to the risk premises, it was revealed that due to the earthquake vibrations, the superstructure walls and partition walls provided in the
residential building had developed wide cracks and the said cracks were observed new and no dust were seen inside the cracks as such it is
confirmed that the said cracks had developed as a result of earthquake vibrations which occurred on 18.09.2010. The said cracks were observed
visible from inner as well as from outer sides of superstructure and partition walls as can be easily ascertained from the photographs arranged by
the undersigned.
The severity of the damages is evident from the photographs taken at the time of survey and as well as the identification of the insured residential
building and are enclosed herewith.
As far as the grounds urged are concerned, apparently, counsel for the appellant was not present before the State Commission at the time
when the case was taken up for hearing. However responsibility to ensure presence at the time the case was taken up for hearing is of the counsel.
Despite its counsel not being present at the time of hearing nor any circumstances having been shown as beyond the control of the appellants
counsel on account of which the counsel could not be present at the time when the case was taken up for hearing, it is not open to the appellant to
raise the plea that the case was heard behind the back of the appellant. Secondly, the plea that the State Commission had misconstrued the survey
report and that there was absolutely no material on the basis of which the report submitted by the surveyor could be discarded is incorrect for the
simple reason that the report of the surveyor itself reveals that the superstructure walls as well as partition walls of the residential building had
developed wide cracks as a result of the earthquake and the same were visible from the inner as well as outer side of the superstructure and
partition walls.
The aforementioned plea of the appellant also does not take into account certificate Annexure-C issued by the Assistant Executive Engineer,
Srinagar Municipal Corporation that the residential house of the respondent was unfit for residential purpose.1 and required complete
reconstruction. The aforementioned certificate was issued by a civil engineer. Even the certificate of estimation of loss is by a civil engineer. On the
other hand, the survey report is by an electrical engineer and can therefore cannot be said to be of much weight on account of the nature of
expertise of civil engineering required for assessment of loss. Besides the photographs appended to the appeal as well as the findings of the
surveyor of the severity of the damage to the superstructure as well as partition walls on account of their having developed wide cracks as
apparent from the photographs speaks for itself. Therefore the plea that there was no material on the basis of which the report submitted by the
surveyor could be discarded is without any basis. The surveyor admitted the severity of the damage but chose to estimate loss based on repair
basis instead of as claimed i.e. reconstruction basis despite admitting in his cross-examination that it was true that once wide cracks developed in
the building the same would need reconstruction and further admitting in the survey report that the severity of the damage to the building on account
of the earthquake was apparent from the wide cracks which had come in the superstructure walls as well as the partition walls of the building.
Certificate i.e. Annexure-C has not been proved to be incorrect or false. In the circumstances there is no reason whatsoever to interfere with the
order of the State Consumer Disputes Redressal Commission.
The appellant has also raised the plea that the State Commission failed to consider the consent letter which formed part of the record. We have
gone over the record produced by the appellant before the State Commission. Although there is a mention of the consent letter being attached to
the survey report but the consent letter was not produced before the State Commission. Although a copy of the consent letter has been placed on
record along with the appeal yet there is no application for permission to place on record additional evidence. In the circumstances it is not open to
the appellant to rely upon the said document. Ignoring the aforementioned technicality, the fact remains that the consent letter was allegedly for Rs.
42,637/- whereas the amount offered to the respondent was only Rs. 27,266/-. The cheque issued for amount of Rs. 27,266/- was returned by
the respondent to the appellant on account of the amount offered being much lower than the amount claimed. Thereafter the respondent filed a
complaint and proved his case before the State Commission. In the circumstances, the plea with regard to the consent letter not having been taken
into account by the State Commission is bereft of merit.
The further plea that the nature of damage was not severe so as to warrant award by treating the building liable to reconstruction and further
that there was no material on the basis of which it could be said that the building in question had to be reconstructed is without any basis. None
else than the surveyor appointed by the appellant has given a finding in the report with regard to the severity of the damage to the superstructure
and the partition walls of the building in question on account of wide cracks. The surveyor in his cross examination has also admitted that it was
correct that once wide cracks develop in the building, the building has to be reconstructed. Coupled with the aforementioned stand is the certificate
Annexure-C issued by a civil engineer mentioning therein that the building was unfit for habitation and required to be reconstructed.
The finding of the State Commission that the survey report had been prepared with a predetermined mind with repairs in focus appears to be
correct for the surveyor in his cross examination admitted that he had made the estimation of loss on the basis of repair whereas the claim was on
the basis of reconstruction. Once the surveyor admitted in the report severity of the damage to the superstructure as well as to the partition walls
on account of the superstructure as well as partition walls having developed wide cracks and further admitted in cross examination that in case
wide cracks developed in a building the same would have to be reconstructed, then obviously the report of the surveyor in as much as it
recommends payment for repairs instead of for reconstruction is legally unsustainable. The civil engineers produced as witnesses by the respondent
deposed with regard to the damage to the building, requirement of its reconstruction as well as the estimate in respect thereof. The credibility of the
said witnesses could not be shattered. No suggestion was put to the said witnesses that their depositions was false or incorrect.
In view of what has been noted above, the appellant has f ailed to make out a case so as to warrant intervention by this court in exercise of its
appellate jurisdiction. In the circumstances we are of the considered view that there is no merit in this appeal and therefore the same is dismissed
but with no order as to costs. Amount deposited by the appellant in satisfaction of the orders of the State Commission be released to the
respondent. Record of the case be returned to the State Commission.